The Sunny Side Up Quilt Along was originally scheduled to begin on May 1 but I have a sponsored post that is scheduled for May 1. The Quiltmaker 100 Blocks Blog Tour is next week and my day is May 2 so let’s just plan on starting Sunny Side up on Saturday, May 4, ok?
Thanks!
rose barnes says
Perfect! I needed more time! I am getting married in Hawaii that week and he might frown if I pull out a sewing machine on our honeymoon! I look froward to starting on it when we get back!
Marie Gilkey says
fine by me. Your part of the block tour will be awesome. Can’t wait to see it.
Susan says
Okay. =) Actually works better for me, too!
pdudgeon says
oh good! that definitely works better for me. i’ve got 204 flyng geese to make and get assembled into rows, so a few extra days is exactly what i needed.
thanks so much for the delay, Judy.I do have all my fabric assembled for the project, so i’m ahead of the game on that score, but was running a bit short on time.
Meloney says
I might even be able to sew along if it on the 4th. 🙂
Linda Steller says
That sounds fun. I’m going to a sew day on Saturday and am supposed to be working on my camp quilt, but maybe I can get a lot of that done beforehand and work on Sunny then. I’ll have an internet connection at the sew day shop.
Terri says
Perfect! I’m a new follower and wasn’t going to participate since I just stumbled on this and didn’t have time to gather fabric. That will be solved by the new starting date, though 😀
Diana in RR Texas says
I can always use the extra time!
Donna Williams says
I was not going to play, but fortunately I find myself with both fabric and time. YAY! Looking forward to it.